Introduce the design team of Zhongchengjiatai
Introduction of the work,delivery text of flow and each stage
Please carry the original plane graph, which is convenient for the preliminary communication and design direction
Make sure the delivery and design result of each stage and finally sign a contract
Pay the initial payment within two work days
Feasibility analysis will be carried out in the early stage.
——全套方案完成/Completion of the whole project
Owner, construction staff, hotel hard installation, soft decoration designer, construction cooperation personnel each hold one drawing
Hotel hard installed main material white paper delivery confirmation
Hotel soft decoration furniture, accessories, art list delivery, confirmation
The hotel designer will disclose the drawings and guide the construction staff
Supervise construction and ensure the details
According to the specific style, reflect the essence of the hotel design
Hotel furniture accessories and artworks in the area
Arrangement of exhibition site
Cleaning of the site