中成嘉泰工组长自检、工程监理专检、工程部质检、总监巡检、总经理抽检、客户定期回访,严控每一道施工工序,缔造酒店施工设计的典范。
1、各工种组长自检:泥水工程、木制作工程、给排水工程、电工程(含弱电)、木制品涂饰工程、墙面涂饰工程,绝不放过质量上的任何一个盲点,为客户打造零缺陷产品。
2、中成嘉泰酒店工程监理专检:工程直接责任人,对工艺过程中的工艺质量、设计调整、材料供应、工人调配、工艺进度、服务质量、工地安全、文明工艺等一切工作负责,每周对每一个工地的工艺情况做质检报告。
3、中成嘉泰酒店工程部质检:严格把关每一道工艺规范标准,做好机电、暖通安装工作,落实责任工艺计划。
4、中成嘉泰酒店总监巡检:负责把控项目推动及设计执行标准,现场指导施工人员实施方案。酒店设计师团队全程跟踪项目,主案设计与业主方要深度交流。
5、总经理抽检:每个星期不定时抽检工地,与业主、设计师、工程人员交流意见及建议,及时解决问题。
6、客户回访:对在建工程和质量保修期内的完工工程,客服人员定期进行客户回访,及时反馈问题,协调各部门快速解决。
(Zhongcheng Jiatai engineering group leader self-inspection, engineering supervision special inspection, engineering department quality inspection, director inspection inspection, general manager sampling inspection, customer regular return visit, strictly control every construction process, to create a model of hotel construction design.
1. Self-inspection of the team leaders of each type of work: mud and water engineering, wood production engineering, water supply and drainage engineering, electrical engineering (including weak current), wood products painting engineering, wall painting engineering, never let go of any blind spot in quality, to create zero-defect products for customers.
2. Special engineering supervision inspection of Zhongchengjiatai Hotel: the person directly responsible for the project is responsible for all the process quality, design adjustment, material supply, worker deployment, process progress, service quality, site safety, civilized process in the process, and make quality inspection report on the process situation of each site every week.
3. Quality inspection of the Engineering Department of Zhongchengjiatai Hotel: strictly check each process specification and standard, do a good job in the installation of mechanical and electrical equipment and HVAC, and implement the responsibility process plan.
4. Director inspection of Zhongchengjiatai Hotel: responsible for controlling the project promotion and design and implementation standards, and guiding the construction personnel to implement the plan on site. The villa designer team tracked the whole project, and the main case design and the owner should communicate in depth.
5. Sampling inspection by general manager: sampling the site from time to time every week, exchange opinions and suggestions with owners, designers and engineers, and solve problems in time.
6. Customer return visit: For the completed projects under construction and the completed projects during the quality warranty period, the customer service personnel will regularly make customer return visits, and timely give feedback on the problems, and coordinate with all departments to solve them quickly.)
中成嘉泰酒店装饰装修材料验收、隐蔽工程验收、分阶段验收、中期验收、预验收、竣工验收,层层把关,成为业内典范。
1、材料验收:材料进场时,对供应厂商严格按质按量验收;业主对材料严格验收:每次验收都需签字确认,保证各方利益,保障工程质量。
2、隐蔽工程验收:隐蔽工程过程监督察看,封闭之前确认签字,保证不遗漏、不出错、无质量问题。
3、分阶段验收:对于局部工程,分别开展工艺前确认,工艺中间监督,工艺完成后验收。对整体性工程,进行局部多次、多阶段严格验收,保证整体质量的一致完整。
4、中期验收:及时发现问题,保证工程的完美,为后期工程进展打下良好基础。
5、预验收:在正式验收之前,各相关管理人员对各自管理的工程部分进行验收,预验收之后才能进行竣工验收。
6、竣工验收:最后验收阶段,业主、设计师、各工种负责人、监理、工程部负责人统一审核检验,交付给业主一个满意的工程。
(Zhongchengjiatai Hotel decoration materials acceptance, concealed engineering acceptance, phased acceptance, mid-term acceptance, Pre-acceptance, completion acceptance, layer upon layer check, become a model in the industry.
1. Material acceptance: When the materials enter the site, the supplier shall strictly accept the quality and quantity; the owner shall strictly accept the materials: Each acceptance shall be signed to ensure the interests of all parties and the quality of the project.
2. Acceptance of concealed works: supervise and inspect the process of concealed works, confirm and sign before the closure, and ensure no omission, no error, and no quality problems.
3. Phased acceptance: For local projects, pre-process confirmation, intermediate process supervision, and acceptance after process completion. For the overall project, the local multiple, multi-stage strict acceptance, to ensure that the overall quality of the consistent integrity.
4. Mid-term acceptance: find problems in time, ensure the perfection of the project, and lay a good foundation for the progress of the later project.
5. Pre-acceptance: Before the formal acceptance, the relevant management personnel shall check and accept the respective managed part of the project, and the completion acceptance shall only be conducted after the pre-acceptance.
6. Completion acceptance: In the final acceptance stage, the owner, the designer, the person in charge of each type of work, the supervisor and the person in charge of the engineering department shall review and inspect it uniformly, and deliver a satisfactory project to the owner.)
工艺团队全职化、工艺流程规范化、质量考核严格化,全面贯彻精细化、流程化、标准化、效率化的品质管理系统。
1、工艺现场规范化
中成嘉泰酒店装饰装修的每个项目都布置统一的品牌标识及工程日志,详细记录工程人员、工程细节和要素。工艺进程中,严格按照国际质量体系严格执行人员、工艺、材料管理规范。工程竣工后,由工程部对项目过程进行登记备案。
2、质量考评严格化
装饰装修针对所有工程人员专门设立“质量考评小组”,严格遵循工程级别与工艺工人级别对应的原则,定期对工艺现场负责人的管理水平、工艺工人的操作水平进行阶段性考评,执行严格的奖惩制度。
(The process team is full-time, the process flow is standardized, the quality assessment is strict, and the quality management system of refinement, process, standardization and efficiency is fully implemented.
1. Process site standardization Each project of the decoration of Zhongchengjiatai hotel is equipped with a unified brand logo and engineering log, which records the engineering personnel, engineering details and elements in detail. In the process, strictly follow the international quality system and strictly implement the personnel, process and material management specifications. After the completion of the project, the engineering department shall register and record the project process.
2. Strict quality assessment For decoration, a "quality assessment team" is specially set up for all engineering personnel to strictly follow the principle that the engineering level corresponds to the level of process workers, regularly assess the management level of the person in charge of the process site and the operation level of the process workers, and implement a strict reward and punishment system.)
专利技术(Patented technology )
吊顶放开裂结构专利技术(Patented technology of ceiling anti cracking structure)
常用的集成吊顶保养不当或者长期处于潮湿等环境中,会出现开裂问题,为此,中成嘉泰装饰独创了受力更均匀的L型吊顶防开裂结构专利技术,高科技材料护航,不必担心开裂问题。
(The commonly used integrated ceiling will be cracked if it is not properly maintained or in a humid environment for a long time. For this reason, Zhongcheng jiatai decoration has created a patented technology of L-shaped ceiling anti cracking structure with more uniform stress. It is escorted by high-tech materials, so there is no need to worry about cracking.)
卫生间给与排水管专利技术(Patent technology of toilet supply and drainage pipe)
一般酒店装修洗手间下水直接有存水弯,但是所有地漏会散发异味,给水长时间不出现热水。
这点在中成嘉泰得到了改进:第一,污、废水分流,连接处使用橡胶密封环,可直接套住下水管,同时盖住底部排水管,形成密封系统。第二,给水采用末端循环系统,3-5秒见热水。
(Generally, there is a water trap in the bathroom of hotel decoration, but all floor drains will emit odor, and the water supply will not be hot for a long time.This point has been improved in Zhongchengjiatai: first, the sewage and waste water are separated. The rubber sealing ring is used at the connection, which can directly cover the down-comer and cover the bottom drain pipe to form a sealing system. Second, the end circulating system is used for water supply, and hot water is available for 3-5 seconds.)
L型电线护管专利技术(Patent technology of L-type wire protective tube)
酒店结构复杂,各个专业工种线路交错复杂容易破损各管线。为此,中成嘉泰酒店装饰独创了L型电线护管专利技术,能有效保护电线,消除多种无形安全隐患。
(The structure of the hotel is complex, and the lines of various disciplines and types of work are staggered and complex, and the pipelines are easy to be damaged. For this reason, Zhongchengjiatai hotel decoration has created the patented technology of L-shaped wire protection tube, which can effectively protect the wires and eliminate various invisible safety hazards.)
酒店装饰防水专利技术(Hotel decoration waterproof patent technology)
一般的酒店卫生间的门套板木材与地面直接接触,容易受潮变形,中成嘉泰装饰施工采用水泥暗护角工艺做法,有效防水防潮。
(In general, the door panel wood of the hotel toilet is in direct contact with the ground, which is easy to be deformed by moisture. The decoration construction of Zhongchengjiatai adopts the process of cement concealed corner protection to effectively prevent water and moisture.)
室内实木包板楼梯水泥基层找平结构专利技术(Patent technology of cement base leveling structure of indoor solid wood clad staircase)
这一装饰环节十分重要,首先设计师测量层高,根据层高对每一节蹈步进行均分高度,做出L型的踏步板,再反复测量、找平衡,最后用适宜的水利砂浆填充,每一步都缺一不可。
(This decoration link is very important. First, the designer measures the floor height, divides the height of each step equally according to the floor height, and makes L-shaped step boards. Then, repeatedly measure and balance, and finally fill with appropriate hydraulic mortar. Each step is indispensable.)
淋浴房地漏处地板砖镶贴施工专利技术(Shower room floor drain floor brick inlay construction patent technology)
小细节也会影响整体美观性,地板砖销贴技术的施工流程:基层处理-找标高、弹线-找平层-弹铺砖控制线-铺砖-勾勒-养护-踢脚线安装操作
(Small details will also affect the overall aesthetics. The construction process of floor tile pinning Technology: base course treatment - elevation finding, snapping line - leveling layer - snapping brick laying control line - brick laying - Outline - curing - skirting line installation)
水地暖卫生间地漏排水口防渗漏施工构造专利技术(Patent technology of leakage prevention construction of water heating toilet)
地是地面集中排水的部位,是容易涉漏的地方。为此,中成嘉泰施工人员在施工时使用水淘技术,妥善保护管道根部,防水层在特殊部位更加有效,防渗漏的效果更加明显。
(The ground is the part of centralized drainage on the ground, which is easy to leak out. To this end, Zhongchengjiatai construction personnel in the construction of water washing technology, properly protect the pipeline root, waterproof layer in special parts are more effective, the effect of leakage prevention is more obvious.)
空调风口装饰专利技术(Patent technology of air conditioning vent decoration)
在众多的酒店装修设计中,人们大多会忽略空调风口的设计细节,中成嘉泰将在每一个细节体现专业及美感。
(In the decoration design of many hotels, people mostly ignore the design details of air-conditioning outlets. Zhongchengjiatai will reflect its professionalism and beauty in every detail.)
酒店装修设计品质保证 (Quality assurance of hotel decoration design)
工艺团队全职化、工艺流程规范化、质量考核严格化,全面贯彻精细化、流程化、标准化、效率化的品质管理系统。
1、工艺现场规范化 。中成嘉泰酒店装饰装修的每个项目都布置统一的品牌标识及工程日志,详细记录工程人员、工程细节和要素。工艺进程中,严格按照国际质量体系执行。人员、工艺、材料管理规范。工程竣工验收后,由工程部对该项目进行登记备案。
2、质量考评严格化。中成嘉泰酒店装饰装修针对所有工程人员专门设立“质量考评小组”,严格遵循工程级别与工艺工人级别相对应的原则,定期对工艺现场负责人的管理水平、工艺工人的操作水平进行阶段性考评,执行严格的奖惩制度。
(Process team full-time, process standardization, strict quality assessment, the comprehensive implementation of the fine, process, standardized, efficient quality management system.
1. Standardization of the process on-site. Each project of Zhongchengjiatai Hotel is decorated with a unified brand logo and engineering log, which records the engineering personnel, engineering details and elements in detail. In the process of the process, in strict accordance with the international quality system implementation. Personnel, process, material management specification. After the completion and acceptance of the project, the engineering Department shall register and record the project.
2. Strict quality evaluation. Zhongchengjiatai Hotel decoration specially set up a "quality evaluation team" for all engineering personnel, strictly follow the principle of corresponding to the engineering level and the level of process workers, regularly on the management level of the responsible person of the process site, the operation level of process workers for phased evaluation, the implementation of strict reward and punishment system.)